Mitsubishi P10 alarm: Program error: division by zero/overflow
Mitsubishi/MELDAS detects invalid mathematical operation in macro or cycle.
For reference only: alarms change with the manufacturer, the control and the machine PLC. Check the full code in the official manual before doing anything. Legal notice.
- Control
- Mitsubishi
- Machine
- Milling, Turning, Mill-turn
- Area
- Program
- Severity
- Stop
Symptoms
- Falla en macro/ciclo.
- Bloque concreto.
- Appears with uninitialised variables.
Common causes
- Division by zero.
- Variable with no value.
- Result out of range.
- Impossible geometry.
First safe checks
- 01Revisar macro/ciclo.
- 02Check denominators and variables.
- 03Simulate after correcting.
What not to do
- Do not machine with a doubtful macro.
- Do not delete the checks.
When to call maintenance:
If it affects OEM macros.
Reset/rearm:
Reset after correcting program.
Official documentation
Choose the manual matching your control series, software version and machine builder. A support portal is a starting point; it does not establish applicability to every model.
Frequently Asked Questions (FAQ)
What does alarm Mitsubishi P10 mean on Mitsubishi?
Mitsubishi/MELDAS detects invalid mathematical operation in macro or cycle. It is an alarm from the Program area, and in the catalog it is listed as “Program error: division by zero/overflow”. On the machine you notice it like this: Falla en macro/ciclo, Bloque concreto, Appears with uninitialised variables.
Why does alarm Mitsubishi P10 come up?
On the shop floor it almost always comes from one of these causes: Division by zero, Variable with no value, Result out of range, Impossible geometry. Rule out the most likely one on your machine first, before touching parameters or swapping anything.
How do you clear alarm Mitsubishi P10?
Reset after correcting program. Resetting without fixing the cause first only hides the problem: Mitsubishi P10 trips again and, in the meantime, you keep working with the machine in bad shape.
What should I check first with alarm Mitsubishi P10?
With the machine stopped and in a safe state, start with these checks: Revisar macro/ciclo, Check denominators and variables, Simulate after correcting. That alone will tell you whether it is the program or whether you need to raise a maintenance job.
What should I NOT do with alarm Mitsubishi P10?
With Mitsubishi P10 active, avoid this: Do not machine with a doubtful macro, Do not delete the checks. Skipping any of these points is what turns a minor stop into an expensive breakdown.
When do I have to call maintenance for alarm Mitsubishi P10?
If it affects OEM macros. If you are not sure how far it goes, stop the machine and report it: a repeat alarm always works out cheaper than a crash.
How serious is alarm Mitsubishi P10?
It is a stop alarm: the cycle will not continue until you fix the cause. It does not always mean serious damage, but it leaves the machine where it is and you have to check it before running again. Guidance reference. Always confirm the full text in the exact machine/control manual.
More alarms for Mitsubishi
Related tools
GSM Code List
List of G and M Codes for CNC Programming. Search and filter ISO commands by control, machine or function.
CNC G-code Simulator
CNC IDE: editing with G/M tooltips, line inspector, conversion between controls and 2D/3D toolpath.
Calculate cycle time
Estimate CNC turning and milling cycle time from G-code. Calculate parts per hour with a breakdown of cutting, rapids, canned cycles and tool changes.