01Note the exact number and any additional screen
The specific number and, if the control offers a PMC diagnostic screen with more detail, whatever appears there. It is the information the service engineer needs and what stops them starting from scratch when they arrive.
02Collect the context
What the machine was doing, whether it was at start-up or while running, whether there was a power cut, whether it was in the middle of a tool change or a clamping sequence, and whether anything has been installed or replaced recently. A PMC fault that appears after an intervention points at that intervention.
03Do one single power cycle, by the procedure
Power down by the builder's procedure, wait and power up. If it was a transient, the machine starts normally. If it comes back, do not insist: switching off and on repeatedly with a hard PMC fault adds no information and can leave actuators in intermediate states.
04Check whether anything is mechanically half-done
If the alarm arrived in the middle of a tool change or a clamping sequence, an arm, a chuck or a clamp may be in an intermediate position. Do not try to move it by hand or force the sequence: that recovery has its own procedure in the machine manual and often requires service mode.
05Do not modify the ladder and do not force signals
The PMC signal forcing functions exist for service engineer diagnosis, not for getting by. Forcing an output can move an actuator with people nearby or skip a safety condition. And editing the builder's ladder without their documentation leaves the machine in a state nobody will be able to audit afterwards.
06Call maintenance or the service engineer with the data collected
Alarm number, context, recent interventions and the state the machine was left in. If a PMC and parameter backup exists, say so: it is the first thing they will ask and it determines whether the repair takes hours or days.